Skip to content

In Stock Lighting

2 products

  • Telbix ES 5W LED Tubular T30 Globe - Natural White - Clear | The Blue Space
    Original price $17
    Current price $13 SALE

    Telbix ES 5W LED Tubular T30 Globe Natural White - Clear

    EOFY Clearance - Only a few left at this price! 5W LED light source 440 lumens of clear crisp light 4000K Natural white light, perfect for task li...

    View full details
    In Stock
    $4 Off RRP
  • Telbix ES 8W LED ST64 Pilot Globe - Warm White in Clear | Globes online at The Blue Space
    Original price $24
    Current price $20 SALE

    Telbix ES 8W LED ST64 Pilot Globe Warm White - Clear

    On Clearance ! 8W LED light source 800 lumens of clear crisp light 3000K warm white light, perfect for adding ambient lighting in bedroom or livin...

    View full details
    In Stock
    $4 Off RRP

In stock lighting means the fittings shown here are boxed and ready to leave the warehouse now, not on a supplier backorder that can run four to eight weeks. If your renovation timeline is fixed and lighting is the piece still missing, this is the range to check first.

Why dispatch speed matters more for lighting than almost anything else

Lighting tends to sit near the end of a renovation sequence. Tiling, waterproofing, cabinetry and plumbing all need to be finished before an electrician can safely mount and wire fittings, which means lighting is often the last trade booked and the one with the least slack left in the schedule. A backordered pendant or a wall light stuck in transit doesn't just delay itself, it holds up the electrician's return visit, pushes out final fit-off, and can stall the certificate of compliance needed to close the job. Choosing from what's already in the warehouse removes that single point of failure.

What's typically kept in stock

Stock levels shift with demand, but the fittings that turn over fastest tend to be the ones builders and electricians specify repeatedly: LED downlights and batten fixings for general ceiling coverage, vanity and mirror strip lighting for bathrooms, exterior wall lights rated for wet areas, and simple pendant and surface-mounted fittings in black, white, brushed nickel and matte black finishes. These are the finishes and formats that suit the widest range of builds, which is exactly why they're prioritised for continuous stock rather than made-to-order runs.

How to use this range without cutting corners

Filter by the fitting type you need, then check the individual product page for the dispatch timeframe stated on that listing, since "in stock" can still mean anywhere from next-business-day to a short handling window depending on warehouse location and order volume. If you're coordinating trades around a fixed date, order as soon as the fitting is confirmed rather than waiting until the week of installation, so there's buffer if a courier delay does occur.

If your timeline isn't urgent

Not every project is running against a deadline. If you have weeks rather than days before your electrician needs fittings on site, it's worth browsing the full lighting range as well, where the selection of styles, finishes and technical specs (dimmable drivers, colour temperature options, IP ratings for wet areas) is broader than what's held in ready stock at any given time. Use this in-stock range as the fast lane, and the main lighting range as the full catalogue.

Checking availability before you commit

Stock is live-tracked against the site, so a fitting showing as available here is available to order now. If a specific finish or size you want isn't currently in this collection, it doesn't mean it's discontinued, it may simply be between stock runs, so it's worth checking back or contacting the team directly if a like-for-like fast-dispatch alternative would work for your timeline.

Frequently Asked Questions

How fast does in stock lighting actually ship?
Most items in this collection dispatch within one to two business days of ordering, though the exact timeframe is listed on each product page. This is significantly faster than made-to-order or backordered lighting, which can take several weeks depending on the supplier.
Why is lighting often the item holding up a renovation?
Lighting is usually installed last, after tiling, cabinetry and waterproofing are complete, so there's little schedule buffer left if a fitting is delayed. A late pendant or downlight can push out the electrician's final visit and delay sign-off on the whole job.
Does in stock mean the exact finish and size I want is available?
It means the collection as a whole is drawn from ready warehouse stock, but individual finishes and sizes can sell through at different rates. Always check the specific product page for current availability before finalising your order.
Should I choose from this range instead of the main lighting collection?
Only if dispatch speed is your priority. The main lighting range offers a wider selection of styles and technical specifications; this collection narrows that down to what's ready to ship immediately.
Can an electrician install lighting from this range without special lead time?
Yes, once the fitting arrives it installs the same way as any other lighting product bought through the main range. The only difference this collection offers is how quickly it gets to site.